Drill 2 sets of holes, the 1/4 " diameter through both pipes,
one 1 " from one end of each pipe, the second and inch further.
The holes should be 90 degrees from each other, and about 1
inch apart.
Then attach the bolts with a nut on each side of the pipe to holt it in place
These bolts will securely anchor the pipe in the concrete (like rebar)
Next:
Step 4 - Check the
fit